prepping the yard for the sauna.



we got the lake superior sauna stones and felled the cedar trees – now it’s time to actually get to work so we can lay a concrete pad for our sauna.

it’s hard to tell, but the ground drops 14 inches over 14 feet, so it was a little tough to get the skid steer to just skim off the turf without digging too much into the underlying soil. and we ended up being short 1.5 yards of of sand because we didn’t properly account for the grade. hi. ho.

too bad i didn’t catch a picture of odin’s face as he watched me drive up in the bobcat – super bonus cool poppi points 🙂

Leave a Reply